Work continues to progress on the Valencia Landing Clubhouse.  Last week, ceiling tiles were installed in the second floor lounge, plumbing continued on some of the kitchen equipment and outside drains. Duct work continued on the HVAC, while dormer roofing was worked on. Cutting began on the sub grade for the tennis courts and lime rock was brought in for the base of the courts. Interior and exterior painting continued throughout the entire building.

The week ending September 10 saw shutters beginning to be installed, the kitchen elevator was finished. Stucco was installed on the back stair case by pool and the pad was poured for the pool heater. Flooring was beginning to be installed in the yoga/fitness room.

Roof work continued on the initial home sites and slabs continued to be poured on sites for the second half of the neighborhood.

 

A lot has happened at Valencia Landing since our last update!

Work continues both inside and outside the Club House. Phase 1 of the homes not only have walls, but the start of roofs! To learn more about the new homes at Valencia Landing, call us at 775-0788 or email info@johnknox.com.

 

 

 

Clear Skies Bring Steps and a Roof

With sunny weather throughout April and May, much work has continued on the Club House at Valencia Landing. As the roof and dormers are added you can almost imagine residents lounging by the pool!

 

 

 

The Club House at Valencia Landing – A Work in Progress

The Week ending March 26 brought the stairs formed which open to the patio as well as stairs to the front entry. Concrete block was also installed as a screen wall for the generator. On the second floor, block work was completed, grouted and inspected. HVAC duct work started on first floor, steel erection started on second floor, and framing started on second floor.

 

Progress Continues on Valencia Landing Clubhouse

The Club House at Valencia Landing is well under way. Since our last update, our construction team has laid the foundation and has started building walls. We are right on track to see a completed club house in October 2021!

Walls begin to go up on the Club House at Valencia Landing (Jan 2021)

 

 

 

Site Plan Now Available!

Site selection starting soon! Call us at (386) 775-0788 to learn more.

 

 

We know everyone is excited to know when floorplans and pricing will become available. We are hoping to release them to everyone currently on the Valencia Landing wait list within the next couple of weeks.

The 34 units colored in green will be the site of the two-bedroom homes and the 34 units colored yellow will be the site of the three-bedroom homes.

We will be releasing more information on the timeframe for the start of construction on the first units when we release the approved floorplans and pricing. We anticipate breaking ground on the first units in March 2021!

Our goal is to see our first resident of Valencia Landing move in immediately after the opening of the Club House in October 2021.

Look for details on floorplans and pricing coming soon by email. If you would like to be included in future updates, fill out the form below!

 

  • This field is for validation purposes and should be left unchanged.

We Broke Ground!

Watch our virtual ground breaking ceremony right here from the comfort of your home!

 

Make sure to bookmark this page so that you can get all of the latest updates on our latest home sites.